4-December-2014
English, PDF, 1,356kb
At an estimated cost of 21 billion USD in 2006, the trans-Saharan gas pipeline would have the\ capacity to transport some 30 billion cubic meters of gas per year from Nigeria to Europe.
4-December-2014
English, PDF, 1,328kb
Niger was ranked in the last position of the 2014 Human Development Index (HDI). The GDP per capita in 2013 is estimated at USD 778 (PPP), almost two times lower than that of Mali, and six times lower compared to Nigeria.
4-December-2014
English, PDF, 1,436kb
Despite their common heritage, the Maghreb and the Sahel remain insufficiently connected. The dissemination of cultural, religious and linguistic trends, the movement of people, and their trade relations serve as ancient bridges between the two regions. Strengthened relations between countries and populations on both sides of the Sahara require infrastructure, increased trade, and a new definition of the border concept.
17-July-2012
English, PDF, 158kb
The report aimed specifically at feeding the political and strategic dialogue between Niger and Luxembourg in preparation of the discussions to come for the meeting of the Partnership Commission that will be held on November, 2012.
15-September-2011
English
A new Trans-Saharan co-operation is needed, viewpoint by Laurent Bossard, Sahel and West Africa Club Secretariat, septembre 2011.
3-August-2010
English, , 2,768kb
(original in French) Together, the five Donors taking part in the evaluation (DPE) accounted for more than half the Official Development Assistance delivered to Niger over the period.
3-August-2010
French, , 2,996kb
En 2007, cinq bailleurs de fonds (Commission Européenne, Belgique, Danemark, France, Luxembourg) se sont réunis pour évaluer leur coopération avec le Niger sur la période 2000-2008.
17-June-2010
English
3-February-2009
English, , 550kb
Niger: a Land of Transit, Interview with Mr. Guy-Michel Bolouvi, West African Journalist, SWAC, January 2009
23-January-2009
English
Regional Livestock Forum, organised by the SWAC in collaboration with ECOWAS, the CILSS, UEMOA and Roppa, Niamey (Niger), 29 January - 4 February 2009